My vision is to support companies and organizations in the development and implementation of mechanical engineering and operational projects. As a Mechanical Engineer by education, combined with a deep passion for new technologies. Specialize in offering cutting-edge digital methods and technologies, including 3D scanning, intelligent 3D modeling, documentation, 3D data processing and optimization, analysis, simulations, VR integration, and more.

Linkedin

Recommendation for Leveraging 3D Technology for Capital Investment Projects in Manufacturing

At In 3D Technology, our founder played a pivotal role in implementing several capital investment projects for a global organization, utilizing cutting-edge 3D technologies to overcome significant challenges in a production environment. This experience underscores our commitment to innovation and precision in mechanical engineering projects within the manufacturing industry.

Key Challenges:

Limited Space: The installation area was tight, requiring precise planning and execution.
Large-Scale Equipment: The project involved the installation of heavy and complex machinery.
Vendor Communication: Miscommunication with the equipment vendor posed risks to the design and integration of process equipment.
Safety Concerns: Work at height and hot work activities introduced significant safety risks.
Ongoing Production: The installation had to occur without halting ongoing production.
Tight Deadlines: The project had a short timeline for implementation.
Documentation Needs: Comprehensive documentation was essential for quick learning and easy maintenance.


Project Goals:

-Minimize Planning and Installation Time: Accelerate the planning and installation process.
-Ensure Zero Incidents: Achieve a zero-incident installation process.
-Minimize Production Downtime: Ensure minimal disruption to production during installation.

By harnessing advanced 3D technologies, we successfully addressed these challenges. The result was a streamlined installation process that met the client's goals, ensuring safety, efficiency, and minimal impact on production. Our efforts were recognized by the management team, as highlighted in the attached recommendation letter.